回复40楼::
英文?哈哈哈我把IAEA的排海报告原文第5.4章贴在这里:
5.4. IAEA Continuous Presence at the
FDNPS
The IAEA, consistent with its commitment to being involved before, during, and after the ALPS treated
water discharges, has a continuous presence at the FDNPS from summer 2023. The IAEA has a dedicated
office at the FDNPS.
The main aspects to consider in that presence are to:
• Observe the safety aspects related to the TEPCO’s Implementation Plan
• Witness the water sampling activities and the process for dispatching samples to the IAEA
corroboration and third parties laboratories.
对了,你能看懂吗?